Archive for ◊ December, 2009 ◊

Sunday, December 20th, 2009

Finally the roof timbers are all in place and the job of making the building waterproof has begun. The builders came back last week to cover the roof in a breathable layer which makes working inside a whole lot dryer. Work can now start on laying the pipes on the upper level for the underfloor heating.

Alf Armstrong called in last week to go through the details and plans to build the wood fired bread oven.